|
NOTE: To return to this page after clicking to another page, click the BACK button or ALT+Left Arrow (PC) or COMMAND+Left Arrow (MAC)
|
Please drive safely and wear your
seat belt!
Folk Festival Registration:
- Folk Festival Setup begins at 8:00am, Thursday July 10, 2025 at the MUSE Sturgeon Bay, WI
- 330 Jefferson Street - Sturgeon Bay, WI 54235
- Folk Festival Registration begins Friday at 8:00am after we're set up.
- If you arrive before registration opens, please be prepared to wait, or you can roll up your sleeves and volunteer to help the setup crew
- Volunteers, come help us setup the new Portable Dance Floor
- Register at MUSE Sturgeon Bay (all weekend)
Refer to directions, Google Maps, Waze, etc. to locate
your lodgings, etc.
Please comply with the check-in and check-out times at
your place of lodging.
NOTE: Illinois State Troopers may still be using specially equipped vans that can take photographs of drivers speeding in IDOT and Tollway construction and maintenance zones. Tickets will be issued by mail to vehicle owners. First-time work zone speeders, including those caught on camera, will be fined $375, with $125 of that sum going to pay off-duty State Troopers to provide added enforcement in construction or maintenance zones. Two-time offenders are subject to a $1,000 fine, including a $250 surcharge to hire Troopers, and the loss of their license for 90 days.
Chicago Area & Northern Illinois Construction:
- Northern Illinois into Wisconsin:
- Usually heavy traffic on I-94 but no major contruction until you enter Wisconsin
- Downtown Chicago: I90-I94 (Kennedy Expy, Dan Ryan Expy, Byrne Interchange)
- Still som construction at Jane Byrne Traffic Interchange Downtown
- Periodic lane reductions & lane closures
- Heavy construction at Edens (I-94) Kennedy (I-90) junction for I-90 reconstruction project
- Reduced to one lane of traffic in each direction
- Relatively little construction on I 94 after I-94 - I-90 junction
- Slow down and use extreme caution when driving through work zones
- Obey posted speed limit and signing.
- Watch for workers or flaggers
- Do not use cell phone or text
To be sure, consult: http://www.gettingaroundillinois.com |
SouthEast Wisconsin Area Construction:
- Kenosha - Racine - Milwaukee Corridor on I-94
- Milwaukee - Manitowoc - Green Bay Corridor on I-43
- Check for lane reductions and traffic pattern changes
- Sometimes down to 2 lanes (out of 4) from North Avenue to Mequon Rd during rush hours
- SouthEast Wisconsin construction projects: http://www.dot.wisconsin.gov/projects/se.htm
NorthEast Wisconsin Area Construction:
- Green Bay (Brown County) to Sturgeon Bay (In Door County)
|
Interstates in Indiana & Michigan to Chicago
|
Here are some suggested routes to Door County
- Let us know if you find better routes:
I. From Chicago, Milwaukee,
Madison (Indiana, Ohio):
I-94 West to I-43 North in Milwaukee, then:
a) Quicker route: I-43 North
to Green Bay then State Hwy 57 exit for Sturgeon Bay; Proceed north on 57 to
Sturgeon Bay;
(Beware of speed trap in Manitowoc County);
b) More Scenic route: I-43
North to Hwy 42 exit for Manitowoc. Proceed north on 42 to
Sturgeon Bay;
(Beware of speed trap between Kewaunee and Sturgeon Bay)
c) In Sturgeon Bay: State Hwy 42 Business to downtown Sturgeon Bay.
II. From Madison:
US-151 North (Beltway) to Fond Du Lac, US-41
North to Green Bay, Hwy 172 East (Loop) to I-43 North, proceed to I-a)
or I-b) above.
III. From The Twin Cities, Minnesota
& Western Wisconsin:
I-94 East to Hwy 29 (before Eau Claire, WI).
East on Hwy 29 through Wausau to Green Bay; then as I-a) above.
IV. From Michigan's Upper Peninsula:
US-141, US-41 or Hwy 35 south to Green Bay;
then as I-a) above.
V. From Lower Michigan,
Ontario and the East:
a) Monotonous Route: I-94 West or
I-90 West to Chicago then as I above. Use I-294 (tollway) as an
alternate route to bypass Chicago expressway congestion and construction traffic.
b) Lake Michigan Car Ferry
Service: US-10 or I-96 west to US-31 to Ludington, Ferry to
Manitowoc, then as I) above, departs Ludington for Manitowoc 9:00am
EDT, Manitowoc-Ludington 2:00pm CDT, 4 Hour Crossing Time, Info & reservations (800)-841-4243 (6am-10pm EDT), http://www.ssbadger.com
.
c) Lake Express Car Ferry Service:
I-96 or US-31 to Rte 46 to downtown Muskegon, Great Lakes Marina, 1920
Lakeshore Drive, Ferry to Milwaukee. Then as I) above, departs Muskegon to Milwaukee
10:15am, 4:45pm, 11:00pm EDT; Milwaukee to Muskegon 6:00am, 12:30pm, 7:00pm
CDT, 2 1/2 Hour Crossing Time, Info & reservations (866)-914-1010, http://www.lake-express.com.
VI. From Northern Iowa:
US-20 East to Dubuque, US-151 North to Madison,
then continue from Madison as I or II above.
Please drive with caution! We want
you in one piece and the Wisconsin State Patrol tickets speeders!!
VII. Maps, Etc.
VIII.
Approximate Driving Times to Sturgeon Bay:
| Location |
Approx. Drive Time |
| Chicago, IL |
4 hours |
| Urbana-Champaign,
IL |
7 hours |
| Milwaukee, WI |
2.5 hours |
| Madison, WI |
3 hours |
| Green Bay, WI |
1.5 hours |
| Appleton, WI |
1.5 to 2 hours |
| Eau Claire, WI |
5 to 5.5 hours |
| Twin Cities, MN |
6-7 hours |
| Winona, MN/La Crosse,
WI |
5 hours |
| Marquette, MI (Upper
Peninsula) |
4-5 hours |
| Detroit, MI (Lower
Peninsula) via I-80/90/94 |
9 hours |
| Detroit, MI (Lower
Peninsula) via Car Ferry |
9 hours |
| Indianapolis, IN |
9 hours |
| South Bend, IN |
6 hours |
| Bloomington, IN |
11 hours |
| Dayton, OH |
9 hours |
| St Louis, MO |
9 hours |
| Iowa City, IA |
7.5 to 8 hours |
| Cedar Falls/Waterloo,
IA |
9 hours |
| Des Moines, IA |
11 hours |
| Dubuque, IA |
6-7 hours |
| Decorah, IA |
5 hours |
| Buffalo, NY |
14 hours |
| Wayne,
NE |
9 to 10
hours |
| Omaha, NE |
10.5 hours |
| Winnipeg, Manitoba,
Canada |
15 hours |
| Toronto, Ontario,
Canada |
13 hours |
|
NOTE: To return to this page after clicking to another page, click the BACK button or ALT+Left Arrow (PC) or COMMAND+Left Arrow (MAC)
|
|